Taylor, United States

Server infrastructure for Game Development in Taylor

There is no single correct server for Game Development; there is a correct one for the workload, the volume and the budget. For a medium Game Development business in Taylor that is about 4 Cores, 48 GB of memory and 4000 GB of storage on VDS.

Choose your infrastructure → From $938.65 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Taylor and its closest data centre Taylor joined by a link to the Toronto data centre, 219 miles away. Taylor Toronto Ontario, Canada
219 miles from Taylor
5–11 ms estimated round trip

Estimated from fibre distance, not measured from Taylor. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Small Game Development

1–10 people · ~5,000 visits a month


$348.50 USD USD

per month · VPS

  • Single Core
  • 16 GB RAM
  • 1500 GB storage
  • GPU on request

About 0.1 requests a second at peak, holding roughly 11.2 GB of working data.

Configure this build →

Large Game Development

51+ people · ~500,000 visits a month


$2,140.15 USD USD

per month · Dedicated Server

  • 16 Cores
  • 196 GB RAM
  • 4000 GB storage
  • Managed
  • GPU on request

About 6.2 requests a second at peak, holding roughly 128 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why Game Development size up this way

Working from about 50,000 visits a month and roughly 26,667 requests a day, storage grows by roughly 300 GB a month at this size, which usually decides the build before CPU does; about 32 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 0.6 req/sec at peak
  • 32 GB working set
  • 300 GB/month growth
  • Linux

Which tiers suit Game Development

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one There is no version of this workload that fits on shared hosting.
VPS Flexible virtual infrastructure with full root access Workable Useful for development, notebooks and light inference, but not for training or sustained compute.
VDS Virtual server with resources pinned to you alone Workable Suits CPU-bound preprocessing and data preparation with a guaranteed share of the machine.
Dedicated Server An entire physical server, configured to your specification Recommended Production compute wants the whole machine, with memory bandwidth that is not being shared.
Bare Metal Physical compute for sustained, demanding workloads Recommended Training, inference and simulation belong on physical hardware, with GPUs available on request.

Game Development workloads you can host

Game assets are enormous binaries, and version control for them is a storage problem more than a code one.

  • Asset version control
  • Build farm
  • Playtest builds
  • Crash & telemetry capture
  • Localisation pipeline

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas, with Toronto marked as the closest to Taylor. Toronto Taylor

Taylor is closest to Toronto. Every marker costs the same per month.

Show all 24 locations and distances from Taylor ▾
Location Distance Est. round trip
Americas · 9 locations
Toronto, Canada 219 miles 5–11 ms
Chicago, United States 225 miles 5–11 ms
New York, United States 491 miles 12–24 ms
Atlanta, United States 590 miles 14–28 ms
Dallas, United States 986 miles 24–48 ms
Miami, United States 1,152 miles 28–56 ms
Seattle, United States 1,925 miles 46–93 ms
Los Angeles, United States 1,967 miles 47–95 ms
Santa Clara, United States 2,063 miles 50–100 ms
Europe, Middle East & Africa · 8 locations
London, United Kingdom 3,763 miles 91–182 ms
Amsterdam, The Netherlands 3,928 miles 95–190 ms
Madrid, Spain 3,970 miles 96–192 ms
Stockholm, Sweden 4,127 miles 100–199 ms
Frankfurt, Germany 4,147 miles 100–200 ms
Milan, Italy 4,340 miles 105–210 ms
Bucharest, Romania 5,032 miles 121–243 ms
Tel Aviv, Israel 5,972 miles 144–288 ms
Asia-Pacific · 7 locations
Tokyo, Japan 6,410 miles 155–309 ms
Delhi NCR, India 7,394 miles 178–357 ms
Hong Kong, China 7,839 miles 189–378 ms
Kolkata, India 7,927 miles 191–383 ms
Mumbai, India 7,935 miles 192–383 ms
Singapore 9,392 miles 227–453 ms
Sydney, Australia 9,468 miles 229–457 ms

Distances are from Taylor. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

Game Development in Taylor

The closest of our 24 data centres to Taylor is Toronto, about 219 miles away. Round-trip time is set by physical distance more than by anything else, so the nearest site is usually the right one.

Taylor has a population of about 61,568, which is why the medium build above is the one most likely to fit a Game Development business here — though the other two are a click away if it does not. Local time is America/Detroit, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to state privacy laws such as the CCPA. Pricing is quoted in USD, and the figure is the same wherever the machine physically sits.

Network reach from Taylor

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Taylor Estimated round trip
Torontoamericas 219 miles 5–11 ms
Chicagoamericas 225 miles 5–11 ms
New Yorkamericas 491 miles 12–24 ms

Taylor sits in Michigan, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the medium size assumed above, that is roughly 26,667 requests a day crossing that link.

Game Development hosting in Taylor — FAQs

What size server does a Game Development business in Taylor, MI need?
Working from about 50,000 visits a month, we would start at 4 cores, 48 GB of memory and 4000 GB of storage on VDS. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Taylor, MI business actually run?
The closest of our 24 data centres to Taylor, MI is , about 353 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for Game Development, or do we need a dedicated server?
Production compute wants the whole machine, with memory bandwidth that is not being shared. You can move up a tier later on the same data and the same IP address.
Can you host asset version control for us?
Yes — asset version control is exactly the kind of workload these builds are sized for, alongside build farm and playtest builds. Game assets are enormous binaries, and version control for them is a storage problem more than a code one.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Taylor

Same city, different workload.

Game Development hosting nearby

The same workload, in the nearest cities.