Newport, United States

Server infrastructure for Mining Software in Newport

Most Mining Software outgrow their first server in one specific place — and it is rarely the one the plan name suggests. For a small Mining Software business in Newport that is about 4 Cores, 48 GB of memory and 500 GB of storage on VDS.

Choose your infrastructure → From $466.15 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Newport and its closest data centre Newport joined by a link to the New York data centre, 150 miles away. Newport New York New York, United States
150 miles from Newport
4–7 ms estimated round trip

Estimated from fibre distance, not measured from Newport. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Medium Mining Software

11–50 people · ~50,000 visits a month


$1,208.65 USD USD

per month · Dedicated Server

  • 8 Cores
  • 128 GB RAM
  • 1500 GB storage
  • Managed

About 13.9 requests a second at peak, holding roughly 96 GB of working data.

Configure this build →

Large Mining Software

51+ people · ~500,000 visits a month


$4,063.90 USD USD

per month · Bare Metal

  • 28 Cores
  • 448 GB RAM
  • 4000 GB storage
  • Managed

About 138.9 requests a second at peak, holding roughly 384 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why Mining Software size up this way

Working from about 5,000 visits a month and roughly 40,000 requests a day, storage grows by roughly 32 GB a month at this size, which usually decides the build before CPU does; about 34 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 1.4 req/sec at peak
  • 33.6 GB working set
  • 32 GB/month growth
  • Linux

Which tiers suit Mining Software

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on.
VPS Flexible virtual infrastructure with full root access Recommended The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow.
VDS Virtual server with resources pinned to you alone Recommended Pinned resources give you the predictable latency your customers will hold you to in an SLA.
Dedicated Server An entire physical server, configured to your specification Recommended Right once the database and the application tier are competing for the same memory on a single virtual instance.
Bare Metal Physical compute for sustained, demanding workloads Workable For platforms running their own virtualization, or holding a large working set entirely in memory.

Mining Software workloads you can host

Block models and scheduling optimisation are batch compute jobs measured in hours.

  • Block model processing
  • Mine planning
  • Scheduling optimisation
  • Survey integration
  • Reporting

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas, with New York marked as the closest to Newport. New York Newport

Newport is closest to New York. Every marker costs the same per month.

Show all 24 locations and distances from Newport ▾
Location Distance Est. round trip
Americas · 9 locations
New York, United States 150 miles 4–7 ms
Toronto, Canada 437 miles 11–21 ms
Chicago, United States 841 miles 20–41 ms
Atlanta, United States 892 miles 22–43 ms
Miami, United States 1,199 miles 29–58 ms
Dallas, United States 1,520 miles 37–73 ms
Seattle, United States 2,501 miles 60–121 ms
Los Angeles, United States 2,582 miles 62–125 ms
Santa Clara, United States 2,679 miles 65–129 ms
Europe, Middle East & Africa · 8 locations
London, United Kingdom 3,318 miles 80–160 ms
Madrid, Spain 3,434 miles 83–166 ms
Amsterdam, The Netherlands 3,502 miles 85–169 ms
Frankfurt, Germany 3,711 miles 90–179 ms
Stockholm, Sweden 3,798 miles 92–183 ms
Milan, Italy 3,871 miles 93–187 ms
Bucharest, Romania 4,612 miles 111–223 ms
Tel Aviv, Israel 5,518 miles 133–266 ms
Asia-Pacific · 7 locations
Tokyo, Japan 6,756 miles 163–326 ms
Delhi NCR, India 7,202 miles 174–348 ms
Mumbai, India 7,666 miles 185–370 ms
Kolkata, India 7,823 miles 189–378 ms
Hong Kong, China 8,014 miles 193–387 ms
Singapore 9,461 miles 228–457 ms
Sydney, Australia 10,077 miles 243–487 ms

Distances are from Newport. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

Mining Software in Newport

The closest of our 24 data centres to Newport is New York, about 150 miles away. Every kilometre between your users and the server is latency you cannot optimise away in software.

Newport has a population of about 24,232, which is why the small build above is the one most likely to fit a Mining Software business here — though the other two are a click away if it does not. Local time is America/New York, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to state privacy laws such as the CCPA. Pricing is quoted in USD, and the figure is the same wherever the machine physically sits.

Network reach from Newport

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Newport Estimated round trip
New Yorkamericas 150 miles 4–7 ms
Torontoamericas 437 miles 11–21 ms
Chicagoamericas 841 miles 20–41 ms

Newport sits in Rhode Island, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the small size assumed above, that is roughly 40,000 requests a day crossing that link.

Mining Software hosting in Newport — FAQs

What size server does a Mining Software business in Newport, RI need?
Working from about 5,000 visits a month, we would start at 4 cores, 48 GB of memory and 500 GB of storage on VDS. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Newport, RI business actually run?
The closest of our 24 data centres to Newport, RI is , about 242 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for Mining Software, or do we need a dedicated server?
The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. You can move up a tier later on the same data and the same IP address.
Can you host block model processing for us?
Yes — block model processing is exactly the kind of workload these builds are sized for, alongside mine planning and scheduling optimisation. Block models and scheduling optimisation are batch compute jobs measured in hours.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Newport

Same city, different workload.

Mining Software hosting nearby

The same workload, in the nearest cities.