Ajax, Canada

Server infrastructure for Mining Software in Ajax

Most Mining Software outgrow their first server in one specific place — and it is rarely the one the plan name suggests. For a medium Mining Software business in Ajax that is about 8 Cores, 128 GB of memory and 1500 GB of storage on Dedicated Server.

Choose your infrastructure → From $1,208.65 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Ajax and its closest data centre Ajax joined by a link to the Toronto data centre, which is in the same city. Ajax Toronto Ontario, Canada
1–2 ms estimated round trip

Estimated from fibre distance, not measured from Ajax. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Small Mining Software

1–10 people · ~5,000 visits a month


$466.15 USD USD

per month · VDS

  • 4 Cores
  • 48 GB RAM
  • 500 GB storage

About 1.4 requests a second at peak, holding roughly 33.6 GB of working data.

Configure this build →

Large Mining Software

51+ people · ~500,000 visits a month


$4,063.90 USD USD

per month · Bare Metal

  • 28 Cores
  • 448 GB RAM
  • 4000 GB storage
  • Managed

About 138.9 requests a second at peak, holding roughly 384 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why Mining Software size up this way

Working from about 50,000 visits a month and roughly 400,000 requests a day, storage grows by roughly 90 GB a month at this size, which usually decides the build before CPU does; about 96 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 13.9 req/sec at peak
  • 96 GB working set
  • 90 GB/month growth
  • Linux

Which tiers suit Mining Software

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on.
VPS Flexible virtual infrastructure with full root access Recommended The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow.
VDS Virtual server with resources pinned to you alone Recommended Pinned resources give you the predictable latency your customers will hold you to in an SLA.
Dedicated Server An entire physical server, configured to your specification Recommended Right once the database and the application tier are competing for the same memory on a single virtual instance.
Bare Metal Physical compute for sustained, demanding workloads Workable For platforms running their own virtualization, or holding a large working set entirely in memory.

Mining Software workloads you can host

Block models and scheduling optimisation are batch compute jobs measured in hours.

  • Block model processing
  • Mine planning
  • Scheduling optimisation
  • Survey integration
  • Reporting

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas. Toronto Ajax

Ajax has a data centre of its own. Every marker costs the same per month.

Show all 24 locations and distances from Ajax ▾
Location Distance Est. round trip
Americas · 9 locations
Toronto, Canada Same city 1–2 ms
New York, United States 336 miles 8–16 ms
Chicago, United States 456 miles 11–22 ms
Atlanta, United States 755 miles 18–36 ms
Dallas, United States 1,225 miles 30–59 ms
Miami, United States 1,251 miles 30–60 ms
Seattle, United States 2,077 miles 50–100 ms
Los Angeles, United States 2,190 miles 53–106 ms
Santa Clara, United States 2,270 miles 55–110 ms
Europe, Middle East & Africa · 8 locations
London, United Kingdom 3,527 miles 85–170 ms
Amsterdam, The Netherlands 3,695 miles 89–178 ms
Madrid, Spain 3,729 miles 90–180 ms
Stockholm, Sweden 3,911 miles 94–189 ms
Frankfurt, Germany 3,913 miles 94–189 ms
Milan, Italy 4,102 miles 99–198 ms
Bucharest, Romania 4,801 miles 116–232 ms
Tel Aviv, Israel 5,737 miles 138–277 ms
Asia-Pacific · 7 locations
Tokyo, Japan 6,429 miles 155–310 ms
Delhi NCR, India 7,218 miles 174–348 ms
Mumbai, India 7,740 miles 187–374 ms
Kolkata, India 7,778 miles 188–376 ms
Hong Kong, China 7,789 miles 188–376 ms
Singapore 9,309 miles 225–449 ms
Sydney, Australia 9,691 miles 234–468 ms

Distances are from Ajax. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

Mining Software in Ajax

The closest of our 24 data centres to Ajax is Toronto, about 22 miles away. Round-trip time is set by physical distance more than by anything else, so the nearest site is usually the right one.

Ajax has a population of about 119,677, which is why the medium build above is the one most likely to fit a Mining Software business here — though the other two are a click away if it does not. Local time is America/Toronto, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to PIPEDA. Pricing is quoted in CAD, and the figure is the same wherever the machine physically sits.

Network reach from Ajax

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Ajax Estimated round trip
Torontoamericas In your metro 1–2 ms
New Yorkamericas 336 miles 8–16 ms
Chicagoamericas 456 miles 11–22 ms

Ajax sits in Ontario, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the medium size assumed above, that is roughly 400,000 requests a day crossing that link.

Mining Software hosting in Ajax — FAQs

What size server does a Mining Software business in Ajax, ON need?
Working from about 50,000 visits a month, we would start at 8 cores, 128 GB of memory and 1500 GB of storage on Dedicated Server. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Ajax, ON business actually run?
The closest of our 24 data centres to Ajax, ON is , about 36 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for Mining Software, or do we need a dedicated server?
The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. You can move up a tier later on the same data and the same IP address.
Can you host block model processing for us?
Yes — block model processing is exactly the kind of workload these builds are sized for, alongside mine planning and scheduling optimisation. Block models and scheduling optimisation are batch compute jobs measured in hours.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Ajax

Same city, different workload.

Mining Software hosting nearby

The same workload, in the nearest cities.