Fareham, United Kingdom
Server infrastructure for Industrial Automation in Fareham
There is no single correct server for Industrial Automation; there is a correct one for the workload, the volume and the budget. For a medium Industrial Automation business in Fareham that is about 4 Cores, 64 GB of memory and 1500 GB of storage on VDS.
- ✓ 5 infrastructure tiers
- ✓ Sized for your workload, not a plan name
- ✓ Same price in all 24 locations
Estimated from fibre distance, not measured from Fareham. Your real figure depends on your connection and route, and lands inside this range.
Choose the infrastructure for your workload
Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.
Small Industrial Automation
1–10 people · ~5,000 visits a month
$296.05 USD USD
per month · VDS
- 2 Cores
- 24 GB RAM
- 500 GB storage
About 0.6 requests a second at peak, holding roughly 16.8 GB of working data.
Configure this build →Medium Industrial Automation Most likely here
11–50 people · ~50,000 visits a month
$709.15 USD USD
per month · VDS
- 4 Cores
- 64 GB RAM
- 1500 GB storage
- Managed
About 6.2 requests a second at peak, holding roughly 48 GB of working data.
Configure this build →Large Industrial Automation
51+ people · ~500,000 visits a month
$2,572.15 USD USD
per month · Dedicated Server
- 16 Cores
- 256 GB RAM
- 4000 GB storage
- Managed
About 61.7 requests a second at peak, holding roughly 192 GB of working data.
Configure this build →These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.
Why Industrial Automation size up this way
Working from about 50,000 visits a month and roughly 213,333 requests a day, storage grows by roughly 100 GB a month at this size, which usually decides the build before CPU does; about 48 GB of data needs to stay in memory to keep queries fast; and the software is Windows-based, which sets a floor on cores, memory and disk before the workload is considered.
- 6.2 req/sec at peak
- 48 GB working set
- 100 GB/month growth
- Windows
Which tiers suit Industrial Automation
Including the ones that do not, and why — that is usually the more useful half.
| Infrastructure | Verdict | Why |
|---|---|---|
| Shared Hosting Managed space on a shared server | Not this one | An ERP or practice-management system needs a database tuned to its own workload, which a shared platform will not allow. |
| VPS Flexible virtual infrastructure with full root access | Workable | Enough for a small team, though the working set of a records system tends to outgrow a modest instance quickly. |
| VDS Virtual server with resources pinned to you alone | Recommended | Guaranteed memory is what keeps the database in cache, which is the single biggest factor in how fast these systems feel. |
| Dedicated Server An entire physical server, configured to your specification | Recommended | The usual answer: a records system rewards a large, uncontended memory pool and consistent disk latency. |
| Bare Metal Physical compute for sustained, demanding workloads | Workable | For large deployments, or where the database and application tiers are virtualized onto one physical host. |
Industrial Automation workloads you can host
The historian records every tag continuously, which is a small write repeated forever.
- PLC programme repository
- HMI applications
- Historian database
- Remote diagnostics
- Simulation environments
Where your server runs
All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.
Fareham is closest to London. Every marker costs the same per month.
Show all 24 locations and distances from Fareham ▾
| Location | Distance | Est. round trip |
|---|---|---|
| Europe, Middle East & Africa · 8 locations | ||
| London, United Kingdom | 64 miles | 2–3 ms |
| Amsterdam, The Netherlands | 281 miles | 7–14 ms |
| Frankfurt, Germany | 436 miles | 11–21 ms |
| Milan, Italy | 605 miles | 15–29 ms |
| Madrid, Spain | 731 miles | 18–35 ms |
| Stockholm, Sweden | 955 miles | 23–46 ms |
| Bucharest, Romania | 1,336 miles | 32–65 ms |
| Tel Aviv, Israel | 2,234 miles | 54–108 ms |
| Americas · 9 locations | ||
| New York, United States | 3,432 miles | 83–166 ms |
| Toronto, Canada | 3,527 miles | 85–170 ms |
| Chicago, United States | 3,928 miles | 95–190 ms |
| Atlanta, United States | 4,178 miles | 101–202 ms |
| Miami, United States | 4,391 miles | 106–212 ms |
| Dallas, United States | 4,727 miles | 114–228 ms |
| Seattle, United States | 4,792 miles | 116–231 ms |
| Santa Clara, United States | 5,366 miles | 130–259 ms |
| Los Angeles, United States | 5,436 miles | 131–262 ms |
| Asia-Pacific · 7 locations | ||
| Delhi NCR, India | 4,235 miles | 102–204 ms |
| Mumbai, India | 4,514 miles | 109–218 ms |
| Kolkata, India | 5,003 miles | 121–242 ms |
| Tokyo, Japan | 6,002 miles | 145–290 ms |
| Hong Kong, China | 6,042 miles | 146–292 ms |
| Singapore | 6,795 miles | 164–328 ms |
| Sydney, Australia | 10,621 miles | 256–513 ms |
Distances are from Fareham. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.
Industrial Automation in Fareham
The closest of our 24 data centres to Fareham is London, about 64 miles away. Choosing the closest data centre is the cheapest performance improvement available, and it costs nothing extra.
Fareham has a population of about 42,210, which is why the medium build above is the one most likely to fit a Industrial Automation business here — though the other two are a click away if it does not. Local time is Europe/London, so routine maintenance and backups are scheduled against your overnight rather than ours.
Data stays in the jurisdiction you choose, which matters if you are working to the UK GDPR and the Data Protection Act 2018. Pricing is quoted in GBP, and the figure is the same wherever the machine physically sits.
Network reach from Fareham
Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.
| Data centre | Distance from Fareham | Estimated round trip |
|---|---|---|
| Londonemea | 64 miles | 2–3 ms |
| Amsterdamemea | 281 miles | 7–14 ms |
| Frankfurtemea | 436 miles | 11–21 ms |
Fareham sits in England, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the medium size assumed above, that is roughly 213,333 requests a day crossing that link.
Industrial Automation hosting in Fareham — FAQs
What size server does a Industrial Automation business in Fareham, England need?
Where would the server for my Fareham, England business actually run?
Is a VPS enough for Industrial Automation, or do we need a dedicated server?
Can you host pLC programme repository for us?
Can we start smaller and grow?
Other industries in Fareham
Same city, different workload.
Industrial Automation hosting nearby
The same workload, in the nearest cities.