Oklahoma, United States

Server infrastructure for Genomics in Oklahoma

Infrastructure for Genomics is a question of matching the machine to the application, then putting it near the people using it. For a small Genomics business in Oklahoma that is about 4 Cores, 48 GB of memory and 3000 GB of storage on VDS.

Choose your infrastructure → From $803.65 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Oklahoma and its closest data centre Oklahoma joined by a link to the Dallas data centre, 191 miles away. Oklahoma Dallas Texas, United States
191 miles from Oklahoma
5–9 ms estimated round trip

Estimated from fibre distance, not measured from Oklahoma. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Medium Genomics

11–50 people · ~50,000 visits a month


$2,140.15 USD USD

per month · Dedicated Server

  • 16 Cores
  • 196 GB RAM
  • 4000 GB storage
  • Managed
  • GPU on request

About 0.5 requests a second at peak, holding roughly 128 GB of working data.

Configure this build →

Large Genomics

51+ people · ~500,000 visits a month


$4,549.90 USD USD

per month · Bare Metal

  • 32 Cores
  • 512 GB RAM
  • 4000 GB storage
  • Managed
  • GPU on request

About 4.6 requests a second at peak, holding roughly 512 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why Genomics size up this way

Working from about 5,000 visits a month and roughly 2,667 requests a day, storage grows by roughly 175 GB a month at this size, which usually decides the build before CPU does; about 45 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 0.1 req/sec at peak
  • 44.8 GB working set
  • 175 GB/month growth
  • Linux

Which tiers suit Genomics

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one There is no version of this workload that fits on shared hosting.
VPS Flexible virtual infrastructure with full root access Workable Useful for development, notebooks and light inference, but not for training or sustained compute.
VDS Virtual server with resources pinned to you alone Workable Suits CPU-bound preprocessing and data preparation with a guaranteed share of the machine.
Dedicated Server An entire physical server, configured to your specification Recommended Production compute wants the whole machine, with memory bandwidth that is not being shared.
Bare Metal Physical compute for sustained, demanding workloads Recommended Training, inference and simulation belong on physical hardware, with GPUs available on request.

Genomics workloads you can host

A single run produces enormous files and the pipeline is CPU-bound for hours — this is batch compute, not a web workload.

  • Sequence alignment
  • Variant calling pipelines
  • Reference genome storage
  • Batch job scheduling
  • Results archive

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas, with Dallas marked as the closest to Oklahoma. Dallas Oklahoma

Oklahoma is closest to Dallas. Every marker costs the same per month.

Show all 24 locations and distances from Oklahoma ▾
Location Distance Est. round trip
Americas · 9 locations
Dallas, United States 191 miles 5–9 ms
Chicago, United States 664 miles 16–32 ms
Atlanta, United States 722 miles 17–35 ms
Toronto, Canada 1,085 miles 26–52 ms
Miami, United States 1,199 miles 29–58 ms
Los Angeles, United States 1,212 miles 29–59 ms
New York, United States 1,291 miles 31–62 ms
Santa Clara, United States 1,393 miles 34–67 ms
Seattle, United States 1,545 miles 37–75 ms
Europe, Middle East & Africa · 8 locations
London, United Kingdom 4,610 miles 111–223 ms
Amsterdam, The Netherlands 4,766 miles 115–230 ms
Madrid, Spain 4,835 miles 117–233 ms
Stockholm, Sweden 4,909 miles 119–237 ms
Frankfurt, Germany 4,988 miles 120–241 ms
Milan, Italy 5,193 miles 125–251 ms
Bucharest, Romania 5,860 miles 141–283 ms
Tel Aviv, Israel 6,813 miles 164–329 ms
Asia-Pacific · 7 locations
Tokyo, Japan 6,318 miles 153–305 ms
Hong Kong, China 7,951 miles 192–384 ms
Delhi NCR, India 7,994 miles 193–386 ms
Kolkata, India 8,406 miles 203–406 ms
Mumbai, India 8,604 miles 208–415 ms
Sydney, Australia 8,647 miles 209–417 ms
Singapore 9,558 miles 231–461 ms

Distances are from Oklahoma. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

Genomics in Oklahoma

The closest of our 24 data centres to Oklahoma is Dallas, about 191 miles away. The price is the same in all 24 locations, so distance is the only variable worth optimising.

Oklahoma has a population of about 1,172, which is why the small build above is the one most likely to fit a Genomics business here — though the other two are a click away if it does not. Local time is America/Chicago, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to state privacy laws such as the CCPA. Pricing is quoted in USD, and the figure is the same wherever the machine physically sits.

Network reach from Oklahoma

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Oklahoma Estimated round trip
Dallasamericas 191 miles 5–9 ms
Chicagoamericas 664 miles 16–32 ms
Atlantaamericas 722 miles 17–35 ms

every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the small size assumed above, that is roughly 2,667 requests a day crossing that link.

Genomics hosting in Oklahoma — FAQs

What size server does a Genomics business in Oklahoma need?
Working from about 5,000 visits a month, we would start at 4 cores, 48 GB of memory and 3000 GB of storage on VDS. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Oklahoma business actually run?
The closest of our 24 data centres to Oklahoma is , about 308 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for Genomics, or do we need a dedicated server?
Production compute wants the whole machine, with memory bandwidth that is not being shared. You can move up a tier later on the same data and the same IP address.
Can you host sequence alignment for us?
Yes — sequence alignment is exactly the kind of workload these builds are sized for, alongside variant calling pipelines and reference genome storage. A single run produces enormous files and the pipeline is CPU-bound for hours — this is batch compute, not a web workload.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Oklahoma

Same city, different workload.

Genomics hosting nearby

The same workload, in the nearest cities.