Opportunity, United States

Server infrastructure for AgTech in Opportunity

There is no single correct server for AgTech; there is a correct one for the workload, the volume and the budget. For a medium AgTech business in Opportunity that is about 4 Cores, 64 GB of memory and 3000 GB of storage on VDS.

Choose your infrastructure → From $911.65 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Opportunity and its closest data centre Opportunity joined by a link to the Seattle data centre, 237 miles away. Opportunity Seattle Washington, United States
237 miles from Opportunity
6–11 ms estimated round trip

Estimated from fibre distance, not measured from Opportunity. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Small AgTech

1–10 people · ~5,000 visits a month


$336.55 USD USD

per month · VDS

  • 2 Cores
  • 24 GB RAM
  • 800 GB storage

About 1.4 requests a second at peak, holding roughly 16.8 GB of working data.

Configure this build →

Large AgTech

51+ people · ~500,000 visits a month


$2,639.65 USD USD

per month · Dedicated Server

  • 20 Cores
  • 256 GB RAM
  • 4000 GB storage
  • Managed

About 138.9 requests a second at peak, holding roughly 192 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why AgTech size up this way

Working from about 50,000 visits a month and roughly 400,000 requests a day, storage grows by roughly 160 GB a month at this size, which usually decides the build before CPU does; about 48 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 13.9 req/sec at peak
  • 48 GB working set
  • 160 GB/month growth
  • Linux

Which tiers suit AgTech

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on.
VPS Flexible virtual infrastructure with full root access Recommended The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow.
VDS Virtual server with resources pinned to you alone Recommended Pinned resources give you the predictable latency your customers will hold you to in an SLA.
Dedicated Server An entire physical server, configured to your specification Recommended Right once the database and the application tier are competing for the same memory on a single virtual instance.
Bare Metal Physical compute for sustained, demanding workloads Workable For platforms running their own virtualization, or holding a large working set entirely in memory.

AgTech workloads you can host

Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.

  • Sensor ingestion
  • Satellite & imagery analysis
  • Prescription mapping
  • Farm dashboards
  • Machinery integrations

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas, with Seattle marked as the closest to Opportunity. Seattle Opportunity

Opportunity is closest to Seattle. Every marker costs the same per month.

Show all 24 locations and distances from Opportunity ▾
Location Distance Est. round trip
Americas · 9 locations
Seattle, United States 237 miles 6–11 ms
Santa Clara, United States 750 miles 18–36 ms
Los Angeles, United States 941 miles 23–45 ms
Dallas, United States 1,481 miles 36–72 ms
Chicago, United States 1,496 miles 36–72 ms
Toronto, Canada 1,830 miles 44–88 ms
Atlanta, United States 1,950 miles 47–94 ms
New York, United States 2,166 miles 52–105 ms
Miami, United States 2,511 miles 61–121 ms
Europe, Middle East & Africa · 8 locations
Stockholm, Sweden 4,627 miles 112–223 ms
London, United Kingdom 4,644 miles 112–224 ms
Amsterdam, The Netherlands 4,733 miles 114–229 ms
Frankfurt, Germany 4,956 miles 120–239 ms
Madrid, Spain 5,118 miles 124–247 ms
Milan, Italy 5,234 miles 126–253 ms
Bucharest, Romania 5,697 miles 138–275 ms
Tel Aviv, Israel 6,661 miles 161–322 ms
Asia-Pacific · 7 locations
Tokyo, Japan 4,984 miles 120–241 ms
Hong Kong, China 6,647 miles 160–321 ms
Delhi NCR, India 7,095 miles 171–343 ms
Kolkata, India 7,331 miles 177–354 ms
Mumbai, India 7,784 miles 188–376 ms
Sydney, Australia 7,965 miles 192–385 ms
Singapore 8,247 miles 199–398 ms

Distances are from Opportunity. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

AgTech in Opportunity

The closest of our 24 data centres to Opportunity is Seattle, about 237 miles away. The price is the same in all 24 locations, so distance is the only variable worth optimising.

Opportunity has a population of about 25,877, which is why the medium build above is the one most likely to fit a AgTech business here — though the other two are a click away if it does not. Local time is America/Los Angeles, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to state privacy laws such as the CCPA. Pricing is quoted in USD, and the figure is the same wherever the machine physically sits.

Network reach from Opportunity

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Opportunity Estimated round trip
Seattleamericas 237 miles 6–11 ms
Santa Claraamericas 750 miles 18–36 ms
Los Angelesamericas 941 miles 23–45 ms

Opportunity sits in Washington, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the medium size assumed above, that is roughly 400,000 requests a day crossing that link.

AgTech hosting in Opportunity — FAQs

What size server does a AgTech business in Opportunity, WA need?
Working from about 50,000 visits a month, we would start at 4 cores, 64 GB of memory and 3000 GB of storage on VDS. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Opportunity, WA business actually run?
The closest of our 24 data centres to Opportunity, WA is , about 382 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for AgTech, or do we need a dedicated server?
The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. You can move up a tier later on the same data and the same IP address.
Can you host sensor ingestion for us?
Yes — sensor ingestion is exactly the kind of workload these builds are sized for, alongside satellite & imagery analysis and prescription mapping. Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Opportunity

Same city, different workload.

AgTech hosting nearby

The same workload, in the nearest cities.