Omagh, United Kingdom

Server infrastructure for AgTech in Omagh

Sizing infrastructure for AgTech starts with the workload, then works back to cores, memory and disk. For a small AgTech business in Omagh that is about 2 Cores, 24 GB of memory and 800 GB of storage on VDS.

Choose your infrastructure → From $336.55 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Omagh and its closest data centre Omagh joined by a link to the London data centre, 366 miles away. Omagh London United Kingdom
366 miles from Omagh
9–18 ms estimated round trip

Estimated from fibre distance, not measured from Omagh. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Medium AgTech

11–50 people · ~50,000 visits a month


$911.65 USD USD

per month · VDS

  • 4 Cores
  • 64 GB RAM
  • 3000 GB storage
  • Managed

About 13.9 requests a second at peak, holding roughly 48 GB of working data.

Configure this build →

Large AgTech

51+ people · ~500,000 visits a month


$2,639.65 USD USD

per month · Dedicated Server

  • 20 Cores
  • 256 GB RAM
  • 4000 GB storage
  • Managed

About 138.9 requests a second at peak, holding roughly 192 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why AgTech size up this way

Working from about 5,000 visits a month and roughly 40,000 requests a day, storage grows by roughly 56 GB a month at this size, which usually decides the build before CPU does; about 17 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 1.4 req/sec at peak
  • 16.8 GB working set
  • 56 GB/month growth
  • Linux

Which tiers suit AgTech

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on.
VPS Flexible virtual infrastructure with full root access Recommended The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow.
VDS Virtual server with resources pinned to you alone Recommended Pinned resources give you the predictable latency your customers will hold you to in an SLA.
Dedicated Server An entire physical server, configured to your specification Recommended Right once the database and the application tier are competing for the same memory on a single virtual instance.
Bare Metal Physical compute for sustained, demanding workloads Workable For platforms running their own virtualization, or holding a large working set entirely in memory.

AgTech workloads you can host

Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.

  • Sensor ingestion
  • Satellite & imagery analysis
  • Prescription mapping
  • Farm dashboards
  • Machinery integrations

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Europe, Middle East & Africa coverage 8 live
Europe, Middle East & Africa data centre locations 8 locations across Europe, Middle East & Africa, with London marked as the closest to Omagh. London Omagh

Omagh is closest to London. Every marker costs the same per month.

Show all 24 locations and distances from Omagh ▾
Location Distance Est. round trip
Europe, Middle East & Africa · 8 locations
London, United Kingdom 366 miles 9–18 ms
Amsterdam, The Netherlands 524 miles 13–25 ms
Frankfurt, Germany 740 miles 18–36 ms
Milan, Italy 962 miles 23–46 ms
Madrid, Spain 994 miles 24–48 ms
Stockholm, Sweden 1,003 miles 24–48 ms
Bucharest, Romania 1,635 miles 39–79 ms
Tel Aviv, Israel 2,566 miles 62–124 ms
Americas · 9 locations
New York, United States 3,119 miles 75–151 ms
Toronto, Canada 3,195 miles 77–154 ms
Chicago, United States 3,588 miles 87–173 ms
Atlanta, United States 3,863 miles 93–187 ms
Miami, United States 4,110 miles 99–198 ms
Dallas, United States 4,390 miles 106–212 ms
Seattle, United States 4,429 miles 107–214 ms
Santa Clara, United States 5,002 miles 121–241 ms
Los Angeles, United States 5,075 miles 123–245 ms
Asia-Pacific · 7 locations
Delhi NCR, India 4,430 miles 107–214 ms
Mumbai, India 4,761 miles 115–230 ms
Kolkata, India 5,177 miles 125–250 ms
Tokyo, Japan 5,898 miles 142–285 ms
Hong Kong, China 6,100 miles 147–295 ms
Singapore 6,973 miles 168–337 ms
Sydney, Australia 10,668 miles 258–515 ms

Distances are from Omagh. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

AgTech in Omagh

The closest of our 24 data centres to Omagh is London, about 366 miles away. Round-trip time is set by physical distance more than by anything else, so the nearest site is usually the right one.

Omagh has a population of about 21,056, which is why the small build above is the one most likely to fit a AgTech business here — though the other two are a click away if it does not. Local time is Europe/London, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to the UK GDPR and the Data Protection Act 2018. Pricing is quoted in GBP, and the figure is the same wherever the machine physically sits.

Network reach from Omagh

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Omagh Estimated round trip
Londonemea 366 miles 9–18 ms
Amsterdamemea 524 miles 13–25 ms
Frankfurtemea 740 miles 18–36 ms

Omagh sits in Northern Ireland, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the small size assumed above, that is roughly 40,000 requests a day crossing that link.

AgTech hosting in Omagh — FAQs

What size server does a AgTech business in Omagh, Northern Ireland need?
Working from about 5,000 visits a month, we would start at 2 cores, 24 GB of memory and 800 GB of storage on VDS. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Omagh, Northern Ireland business actually run?
The closest of our 24 data centres to Omagh, Northern Ireland is , about 589 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for AgTech, or do we need a dedicated server?
The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. You can move up a tier later on the same data and the same IP address.
Can you host sensor ingestion for us?
Yes — sensor ingestion is exactly the kind of workload these builds are sized for, alongside satellite & imagery analysis and prescription mapping. Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Omagh

Same city, different workload.

AgTech hosting nearby

The same workload, in the nearest cities.