Sizing infrastructure for AgTech starts with the workload, then works back to cores, memory and disk. For a small AgTech business in Leland that is about 2 Cores, 24 GB of memory and 800 GB of storage on VDS.

Choose your infrastructure → From $336.55 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Leland and its closest data centre Leland joined by a link to the Atlanta data centre, 365 miles away. Leland Atlanta Georgia, United States
365 miles from Leland
9–18 ms estimated round trip

Estimated from fibre distance, not measured from Leland. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Medium AgTech

11–50 people · ~50,000 visits a month


$911.65 USD USD

per month · VDS

  • 4 Cores
  • 64 GB RAM
  • 3000 GB storage
  • Managed

About 13.9 requests a second at peak, holding roughly 48 GB of working data.

Configure this build →

Large AgTech

51+ people · ~500,000 visits a month


$2,639.65 USD USD

per month · Dedicated Server

  • 20 Cores
  • 256 GB RAM
  • 4000 GB storage
  • Managed

About 138.9 requests a second at peak, holding roughly 192 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why AgTech size up this way

Working from about 5,000 visits a month and roughly 40,000 requests a day, storage grows by roughly 56 GB a month at this size, which usually decides the build before CPU does; about 17 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 1.4 req/sec at peak
  • 16.8 GB working set
  • 56 GB/month growth
  • Linux

Which tiers suit AgTech

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on.
VPS Flexible virtual infrastructure with full root access Recommended The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow.
VDS Virtual server with resources pinned to you alone Recommended Pinned resources give you the predictable latency your customers will hold you to in an SLA.
Dedicated Server An entire physical server, configured to your specification Recommended Right once the database and the application tier are competing for the same memory on a single virtual instance.
Bare Metal Physical compute for sustained, demanding workloads Workable For platforms running their own virtualization, or holding a large working set entirely in memory.

AgTech workloads you can host

Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.

  • Sensor ingestion
  • Satellite & imagery analysis
  • Prescription mapping
  • Farm dashboards
  • Machinery integrations

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas, with Atlanta marked as the closest to Leland. Atlanta Leland

Leland is closest to Atlanta. Every marker costs the same per month.

Show all 24 locations and distances from Leland ▾
Location Distance Est. round trip
Americas · 9 locations
Atlanta, United States 365 miles 9–18 ms
New York, United States 498 miles 12–24 ms
Miami, United States 601 miles 15–29 ms
Toronto, Canada 653 miles 16–32 ms
Chicago, United States 740 miles 18–36 ms
Dallas, United States 1,084 miles 26–52 ms
Los Angeles, United States 2,283 miles 55–110 ms
Santa Clara, United States 2,448 miles 59–118 ms
Seattle, United States 2,449 miles 59–118 ms
Europe, Middle East & Africa · 8 locations
London, United Kingdom 3,921 miles 95–189 ms
Madrid, Spain 3,985 miles 96–192 ms
Amsterdam, The Netherlands 4,110 miles 99–198 ms
Frankfurt, Germany 4,316 miles 104–208 ms
Stockholm, Sweden 4,418 miles 107–213 ms
Milan, Italy 4,462 miles 108–215 ms
Bucharest, Romania 5,219 miles 126–252 ms
Tel Aviv, Israel 6,110 miles 148–295 ms
Asia-Pacific · 7 locations
Tokyo, Japan 7,028 miles 170–339 ms
Delhi NCR, India 7,811 miles 189–377 ms
Mumbai, India 8,285 miles 200–400 ms
Kolkata, India 8,410 miles 203–406 ms
Hong Kong, China 8,446 miles 204–408 ms
Sydney, Australia 9,646 miles 233–466 ms
Singapore 9,974 miles 241–482 ms

Distances are from Leland. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

AgTech in Leland

The closest of our 24 data centres to Leland is Atlanta, about 365 miles away. The price is the same in all 24 locations, so distance is the only variable worth optimising.

Leland has a population of about 17,924, which is why the small build above is the one most likely to fit a AgTech business here — though the other two are a click away if it does not. Local time is America/New York, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to state privacy laws such as the CCPA. Pricing is quoted in USD, and the figure is the same wherever the machine physically sits.

Network reach from Leland

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Leland Estimated round trip
Atlantaamericas 365 miles 9–18 ms
New Yorkamericas 498 miles 12–24 ms
Miamiamericas 601 miles 15–29 ms

Leland sits in North Carolina, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the small size assumed above, that is roughly 40,000 requests a day crossing that link.

AgTech hosting in Leland — FAQs

What size server does a AgTech business in Leland, NC need?
Working from about 5,000 visits a month, we would start at 2 cores, 24 GB of memory and 800 GB of storage on VDS. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Leland, NC business actually run?
The closest of our 24 data centres to Leland, NC is , about 587 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for AgTech, or do we need a dedicated server?
The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. You can move up a tier later on the same data and the same IP address.
Can you host sensor ingestion for us?
Yes — sensor ingestion is exactly the kind of workload these builds are sized for, alongside satellite & imagery analysis and prescription mapping. Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Leland

Same city, different workload.

AgTech hosting nearby

The same workload, in the nearest cities.