Fredericton, Canada

Server infrastructure for Mining Software in Fredericton

Sizing infrastructure for Mining Software starts with the workload, then works back to cores, memory and disk. For a medium Mining Software business in Fredericton that is about 8 Cores, 128 GB of memory and 1500 GB of storage on Dedicated Server.

Choose your infrastructure → From $1,208.65 USD / month
  • 5 infrastructure tiers
  • Sized for your workload, not a plan name
  • Same price in all 24 locations
Closest location live
Fredericton and its closest data centre Fredericton joined by a link to the New York data centre, 516 miles away. Fredericton New York New York, United States
516 miles from Fredericton
12–25 ms estimated round trip

Estimated from fibre distance, not measured from Fredericton. Your real figure depends on your connection and route, and lands inside this range.

Choose the infrastructure for your workload

Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.

Small Mining Software

1–10 people · ~5,000 visits a month


$466.15 USD USD

per month · VDS

  • 4 Cores
  • 48 GB RAM
  • 500 GB storage

About 1.4 requests a second at peak, holding roughly 33.6 GB of working data.

Configure this build →

Large Mining Software

51+ people · ~500,000 visits a month


$4,063.90 USD USD

per month · Bare Metal

  • 28 Cores
  • 448 GB RAM
  • 4000 GB storage
  • Managed

About 138.9 requests a second at peak, holding roughly 384 GB of working data.

Configure this build →

These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.

Why Mining Software size up this way

Working from about 50,000 visits a month and roughly 400,000 requests a day, storage grows by roughly 90 GB a month at this size, which usually decides the build before CPU does; about 96 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.

  • 13.9 req/sec at peak
  • 96 GB working set
  • 90 GB/month growth
  • Linux

Which tiers suit Mining Software

Including the ones that do not, and why — that is usually the more useful half.

Infrastructure Verdict Why
Shared Hosting Managed space on a shared server Not this one Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on.
VPS Flexible virtual infrastructure with full root access Recommended The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow.
VDS Virtual server with resources pinned to you alone Recommended Pinned resources give you the predictable latency your customers will hold you to in an SLA.
Dedicated Server An entire physical server, configured to your specification Recommended Right once the database and the application tier are competing for the same memory on a single virtual instance.
Bare Metal Physical compute for sustained, demanding workloads Workable For platforms running their own virtualization, or holding a large working set entirely in memory.

Mining Software workloads you can host

Block models and scheduling optimisation are batch compute jobs measured in hours.

  • Block model processing
  • Mine planning
  • Scheduling optimisation
  • Survey integration
  • Reporting

Where your server runs

All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.

Americas coverage 9 live
Americas data centre locations 9 locations across Americas, with New York marked as the closest to Fredericton. New York Fredericton

Fredericton is closest to New York. Every marker costs the same per month.

Show all 24 locations and distances from Fredericton ▾
Location Distance Est. round trip
Americas · 9 locations
New York, United States 516 miles 12–25 ms
Toronto, Canada 643 miles 16–31 ms
Chicago, United States 1,077 miles 26–52 ms
Atlanta, United States 1,257 miles 30–61 ms
Miami, United States 1,582 miles 38–76 ms
Dallas, United States 1,833 miles 44–88 ms
Seattle, United States 2,579 miles 62–125 ms
Los Angeles, United States 2,798 miles 68–135 ms
Santa Clara, United States 2,856 miles 69–138 ms
Europe, Middle East & Africa · 8 locations
London, United Kingdom 2,951 miles 71–142 ms
Madrid, Spain 3,112 miles 75–150 ms
Amsterdam, The Netherlands 3,130 miles 76–151 ms
Frankfurt, Germany 3,343 miles 81–161 ms
Stockholm, Sweden 3,414 miles 82–165 ms
Milan, Italy 3,513 miles 85–170 ms
Bucharest, Romania 4,241 miles 102–205 ms
Tel Aviv, Israel 5,157 miles 124–249 ms
Asia-Pacific · 7 locations
Tokyo, Japan 6,564 miles 158–317 ms
Delhi NCR, India 6,819 miles 165–329 ms
Mumbai, India 7,281 miles 176–352 ms
Kolkata, India 7,450 miles 180–360 ms
Hong Kong, China 7,720 miles 186–373 ms
Singapore 9,118 miles 220–440 ms
Sydney, Australia 10,288 miles 248–497 ms

Distances are from Fredericton. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.

Mining Software in Fredericton

The closest of our 24 data centres to Fredericton is New York, about 516 miles away. Every kilometre between your users and the server is latency you cannot optimise away in software.

Fredericton has a population of about 63,116, which is why the medium build above is the one most likely to fit a Mining Software business here — though the other two are a click away if it does not. Local time is America/Moncton, so routine maintenance and backups are scheduled against your overnight rather than ours.

Data stays in the jurisdiction you choose, which matters if you are working to PIPEDA. Pricing is quoted in CAD, and the figure is the same wherever the machine physically sits.

Network reach from Fredericton

Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.

Data centre Distance from Fredericton Estimated round trip
New Yorkamericas 516 miles 12–25 ms
Torontoamericas 643 miles 16–31 ms
Chicagoamericas 1,077 miles 26–52 ms

Fredericton sits in New Brunswick, and every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the medium size assumed above, that is roughly 400,000 requests a day crossing that link.

Mining Software hosting in Fredericton — FAQs

What size server does a Mining Software business in Fredericton, NB need?
Working from about 50,000 visits a month, we would start at 8 cores, 128 GB of memory and 1500 GB of storage on Dedicated Server. That is an assumption about traffic rather than a measurement of yours — if you know your real figures, the estimate changes with them.
Where would the server for my Fredericton, NB business actually run?
The closest of our 24 data centres to Fredericton, NB is , about 831 km away. You can choose any of the others at the same price — the server is wherever suits your users, not wherever you happen to be.
Is a VPS enough for Mining Software, or do we need a dedicated server?
The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. You can move up a tier later on the same data and the same IP address.
Can you host block model processing for us?
Yes — block model processing is exactly the kind of workload these builds are sized for, alongside mine planning and scheduling optimisation. Block models and scheduling optimisation are batch compute jobs measured in hours.
Can we start smaller and grow?
Yes. Memory, cores and disk can all be raised on the same server, usually within the hour, with no rebuild and no new IP address. Starting one size below your estimate is normally the cheaper mistake.

Other industries in Fredericton

Same city, different workload.

Mining Software hosting nearby

The same workload, in the nearest cities.