Massey East, New Zealand
Server infrastructure for AgTech in Massey East
Infrastructure for AgTech is a question of matching the machine to the application, then putting it near the people using it. For a small AgTech business in Massey East that is about 2 Cores, 24 GB of memory and 800 GB of storage on VDS.
- ✓ 5 infrastructure tiers
- ✓ Sized for your workload, not a plan name
- ✓ Same price in all 24 locations
Estimated from fibre distance, not measured from Massey East. Your real figure depends on your connection and route, and lands inside this range.
Choose the infrastructure for your workload
Three sizes of business, each sized from an assumed traffic figure rather than a measured one. If you know your own numbers, tell us and the estimate changes with them.
Small AgTech Most likely here
1–10 people · ~5,000 visits a month
$336.55 USD USD
per month · VDS
- 2 Cores
- 24 GB RAM
- 800 GB storage
About 1.4 requests a second at peak, holding roughly 16.8 GB of working data.
Configure this build →Medium AgTech
11–50 people · ~50,000 visits a month
$911.65 USD USD
per month · VDS
- 4 Cores
- 64 GB RAM
- 3000 GB storage
- Managed
About 13.9 requests a second at peak, holding roughly 48 GB of working data.
Configure this build →Large AgTech
51+ people · ~500,000 visits a month
$2,639.65 USD USD
per month · Dedicated Server
- 20 Cores
- 256 GB RAM
- 4000 GB storage
- Managed
About 138.9 requests a second at peak, holding roughly 192 GB of working data.
Configure this build →These figures are assumptions stated out loud, not predictions about your business. Memory, cores and disk can all be raised on the same server later, usually within the hour, with no rebuild and no new IP address — so starting one size below the estimate is normally the cheaper mistake.
Why AgTech size up this way
Working from about 5,000 visits a month and roughly 40,000 requests a day, storage grows by roughly 56 GB a month at this size, which usually decides the build before CPU does; about 17 GB of data needs to stay in memory to keep queries fast; and each request costs real computation rather than a cache lookup, so cores matter more here than on a typical site.
- 1.4 req/sec at peak
- 16.8 GB working set
- 56 GB/month growth
- Linux
Which tiers suit AgTech
Including the ones that do not, and why — that is usually the more useful half.
| Infrastructure | Verdict | Why |
|---|---|---|
| Shared Hosting Managed space on a shared server | Not this one | Shared hosting cannot run background workers, queues or long-lived processes, which a SaaS application depends on. |
| VPS Flexible virtual infrastructure with full root access | Recommended | The natural home for an early-stage product: root access, your own runtime, and the ability to resize as you grow. |
| VDS Virtual server with resources pinned to you alone | Recommended | Pinned resources give you the predictable latency your customers will hold you to in an SLA. |
| Dedicated Server An entire physical server, configured to your specification | Recommended | Right once the database and the application tier are competing for the same memory on a single virtual instance. |
| Bare Metal Physical compute for sustained, demanding workloads | Workable | For platforms running their own virtualization, or holding a large working set entirely in memory. |
AgTech workloads you can host
Imagery analysis over whole holdings is heavy compute against data that arrives on a satellite's schedule.
- Sensor ingestion
- Satellite & imagery analysis
- Prescription mapping
- Farm dashboards
- Machinery integrations
Where your server runs
All 24 locations cost the same, so pick whichever sits closest to the people who will actually use the server.
Massey East is closest to Sydney. Every marker costs the same per month.
Show all 24 locations and distances from Massey East ▾
| Location | Distance | Est. round trip |
|---|---|---|
| Asia-Pacific · 7 locations | ||
| Sydney, Australia | 1,332 miles | 32–64 ms |
| Singapore | 5,222 miles | 126–252 ms |
| Tokyo, Japan | 5,489 miles | 133–265 ms |
| Hong Kong, China | 5,672 miles | 137–274 ms |
| Kolkata, India | 6,942 miles | 168–335 ms |
| Mumbai, India | 7,633 miles | 184–369 ms |
| Delhi NCR, India | 7,739 miles | 187–374 ms |
| Americas · 9 locations | ||
| Los Angeles, United States | 6,527 miles | 158–315 ms |
| Santa Clara, United States | 6,532 miles | 158–315 ms |
| Seattle, United States | 7,008 miles | 169–338 ms |
| Dallas, United States | 7,457 miles | 180–360 ms |
| Miami, United States | 8,063 miles | 195–389 ms |
| Atlanta, United States | 8,110 miles | 196–392 ms |
| Chicago, United States | 8,203 miles | 198–396 ms |
| Toronto, Canada | 8,636 miles | 208–417 ms |
| New York, United States | 8,826 miles | 213–426 ms |
| Europe, Middle East & Africa · 8 locations | ||
| Tel Aviv, Israel | 10,142 miles | 245–490 ms |
| Stockholm, Sweden | 10,564 miles | 255–510 ms |
| Bucharest, Romania | 10,717 miles | 259–517 ms |
| Amsterdam, The Netherlands | 11,253 miles | 272–543 ms |
| Frankfurt, Germany | 11,284 miles | 272–545 ms |
| London, United Kingdom | 11,390 miles | 275–550 ms |
| Milan, Italy | 11,475 miles | 277–554 ms |
| Madrid, Spain | 12,173 miles | 294–588 ms |
Distances are from Massey East. Round trips are estimated from fibre distance, not measured — the figure your users see depends on where they are.
AgTech in Massey East
The closest of our 24 data centres to Massey East is Sydney, about 1,332 miles away. Round-trip time is set by physical distance more than by anything else, so the nearest site is usually the right one.
Massey East has a population of about 22,210, which is why the small build above is the one most likely to fit a AgTech business here — though the other two are a click away if it does not. Local time is Pacific/Auckland, so routine maintenance and backups are scheduled against your overnight rather than ours.
Data stays in the jurisdiction you choose, which matters if you are working to the Privacy Act 2020. Pricing is quoted in NZD, and the figure is the same wherever the machine physically sits.
Network reach from Massey East
Estimated from fibre distance rather than measured, and stated as a range. Your own access network decides the rest.
| Data centre | Distance from Massey East | Estimated round trip |
|---|---|---|
| Sydneyapac | 1,332 miles | 32–64 ms |
| Singaporeapac | 5,222 miles | 126–252 ms |
| Tokyoapac | 5,489 miles | 133–265 ms |
every one of our 24 locations costs the same — so the only thing worth optimising is which of them your users are closest to. At the small size assumed above, that is roughly 40,000 requests a day crossing that link.
AgTech hosting in Massey East — FAQs
What size server does a AgTech business in Massey East, Auckland need?
Where would the server for my Massey East, Auckland business actually run?
Is a VPS enough for AgTech, or do we need a dedicated server?
Can you host sensor ingestion for us?
Can we start smaller and grow?
Other industries in Massey East
Same city, different workload.
AgTech hosting nearby
The same workload, in the nearest cities.